Pre-Task Planning (PTP) Form  ·  OSHA-Aligned · Free Template
← Back to Resources

Pre-Task Planning (PTP)

Daily Job Hazard Analysis · Complete before work begins

Template provided by Greenberg Safety
greenbergsafety.com
(512) 585-7070
1 · Project & Task Information
2 · Permit Requirements
Hot Work Permit required (welding, cutting, grinding)
Confined Space Entry Permit required
Excavation / Trenching Permit required
Lockout / Tagout (LOTO) required
Elevated Work Permit required (>6 ft)
Electrical Work Permit required
Crane / Lift Plan required
Other:  
3 · Hazard Identification & Controls

Identify each hazard present for today's task. List the control measure(s) in place before work begins.

# Hazard Description Hazard Type Control Measure(s)
1
2
3
4
5
4 · PPE Requirements

Check all PPE required for today's task. Workers must confirm they have and will use each item checked below.

Head & Face
Hard Hat (Class E)
Safety Glasses / Goggles
Face Shield
Welding Helmet
Hearing Protection
Respirator / N95 Mask
Body & Hands
Hi-Vis Safety Vest (ANSI Class 2+)
Cut-Resistant Gloves
Chemical-Resistant Gloves
Flame-Resistant (FR) Clothing
Arc Flash PPE
Leather / Work Gloves
Fall & Foot
Full-Body Harness
Shock-Absorbing Lanyard
Self-Retracting Lifeline (SRL)
Steel-Toe Boots
Rubber / Dielectric Boots
Metatarsal Guards
5 · Emergency Information
Stop Work Authority: Every worker on this crew has the right and responsibility to stop work if they observe an unsafe condition. No worker will face retaliation for exercising Stop Work Authority.
6 · Crew Acknowledgment & Sign-In

By signing below, each crew member confirms they have reviewed today's hazards and controls, understand their PPE requirements, and are aware of the Stop Work Authority policy.

# Worker Name (Print) Trade / Craft Signature Time In
1
2
3
4
5
6
7
8